成年轻人电影www无码,国产二级一片内射视频播放,av无码一区二区三区,少妇高潮惨叫久久久久久电影

上海金泰工程機(jī)械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

国产猛烈高潮尖叫视频免费| 少妇粉嫩小泬喷水视频 | 粗大黑人巨精大战欧美成人| 免费的成年私人影院网站| 亚洲国产一成人久久精品| 欧美午夜特黄aaaaaa片| 国产精品成人va在线观看| 日出水了特别黄的视频| 久久久中日ab精品综合 | 亚洲丁香婷婷久久一区二区| 日日碰狠狠添天天爽无码| 国产免费午夜a无码v视频| 狠狠色噜噜狠狠狠狠97首创麻豆| 大陆极品少妇内射aaaaaa| 特级西西人体444www高清大胆| 欧美又大粗又爽又黄大片视频| 吸咬奶头狂揉60分钟视频| 亚洲国产成人精品无码区花野真一| 好好日网站| 粗大的内捧猛烈进出看视频| 性xxxxx大片免费视频| 中国亚洲女人69内射少妇| 精品无码一区二区三区亚洲桃色| 久久99国产精品成人| 特级西西444ww大胆高清图片| 欧美成妇人吹潮在线播放| 国产av无码专区亚洲av果冻传媒| 内射人妻视频国内| 亚洲欧美国产日韩天堂区| 成人免费区一区二区三区| 亚洲精品四区麻豆文化传媒| 影音先锋中文字幕无码资源站| 97精品伊人久久大香线蕉| 伊人久久精品无码麻豆一区| 精品久久久久久无码人妻热| 青草青草久热精品视频在线观看 | 暖暖 免费 高清 日本 在线| 国产精品久久婷婷六月丁香| 精品无码一区二区三区爱欲九九 | 全部孕妇毛片丰满孕妇孕交| 黑人大战中国av女叫惨了|