精品无码日韩一区二区三区不卡,强奷乱码中文字幕熟女导航,超碰国产精品久久国产精品99,久久国产精品久久喷水

上海金泰工程機(jī)械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

国产猛烈高潮尖叫视频免费| 18岁污榴莲丝瓜草莓秋2023| 亚洲无线看天堂av| 北条麻妃一区二区三区av高清| 波多野结衣中文字幕一区二区三区| 一本色道久久综合一| 狠狠色噜噜狠狠亚洲av| 18国产精品白浆在线观看免费 | 99久久超碰中文字幕伊人| 人人天天爱天天做天天摸| 国产白嫩美女在线观看| 国产精品青青在线观看爽香蕉| 久久成人麻豆午夜电影| 日韩精品中文字幕无码一区| www婷婷av久久久影片| 久久天天躁夜夜躁狠狠| 国产情侣一区二区| 精品国产男人的天堂久久| 亚洲日韩欧美国产高清αv| 欧洲无码一区二区三区在线观看| 久久久国产成人一区二区| 成全电影大全免费观看在线播放视频 | 影音先锋女人aa鲁色资源| 国产色无码专区在线观看| 国产成人无码a区在线观看视频| 午夜精品久久久内射近拍高清| 精品国产sm最大网站| 四虎国产精品成人| 蜜臀av无码人妻精品| 香蕉在线 亚洲 欧美 专区| 性色av免费网站| 国内精品人妻无码久久久影院导航| 台湾成人娱乐网| 性久久久久久久| 我把护士日出水了视频90分钟 | 亚洲国产婷婷香蕉久久久久久| 国产美女精品一区二区三区 | 人人妻人人玩人人澡人人爽 | 中国免费看的片| 性欧美大战久久久久久久久| 婷婷五月综合激情|