精品无码日韩一区二区三区不卡,强奷乱码中文字幕熟女导航,超碰国产精品久久国产精品99,久久国产精品久久喷水

上海金泰工程機(jī)械有限公司
上海安亭洛浦路45號 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

狠狠人妻久久久久久综合| 波多野42部无码喷潮| 色综合中文综合网| 国产乱人伦偷精品视频不卡| 日本阿v片在线播放免费 | 好大好深好猛好爽视频免费| 久久精品九九亚洲精品 | 后入内射国产一区二区| 日韩乱码人妻无码中文字幕久久 | 亚洲国产精品久久久久秋霞1| 特黄特色的大片观看免费视频| а√天堂www在线а√天堂视频| 午夜福利09不卡片在线机视频| 亚洲日韩av无码| 久久无码高潮喷水| 国产乱人伦偷精品视频| 疯狂做受xxxx欧美老人| 天天做天天爱天天爽综合网| 中文字幕亚洲精品无码| 300部国产真实乱| 久久青青草原亚洲av无码麻豆| 亚洲精品无码永久在线观看| 亚洲日韩av无码| 亚洲亚洲人成综合网络| 无码乱人伦一区二区亚洲 | 欧洲熟妇色xxxx欧美老妇| 国内精品无码一区二区三区| 好爽又高潮了毛片免费下载| 老熟妇仑乱视频一区二区| 亚洲男人第一无码av网站| 国产乱了真实在线观看| 国产精品无码av一区二区三区| 狠狠做深爱婷婷久久综合一区| 男人和女人高潮免费网站| 玩两个丰满老熟女久久网| 亚洲人成色7777在线观看不卡| 久久久精品免费| 粗壮挺进人妻水蜜桃成熟漫画| 又色又爽又黄又无遮挡网站| 无码夜色一区二区三区| 亚洲人成电影网站色mp4|